Email Us
Need Help?
Email now!

Certifications
Recently Viewed
YC324-FK-0788R7L

YC324-FK-0788R7L

RES ARRAY 4 RES 88.7 OHM 2012

SXO75C3A071-20.000M

SXO75C3A071-20.000M

XTAL OSC XO 20.000MHZ CMOS SMD

DF08S

DF08S

BRIDGE RECT 1P 800V 1.5A 4SDIP

CBXQ4EI-A

CBXQ4EI-A

MOD BOX SMD 4PORT IVORY

DF08S

DF08S

Image is for reference, please contact us to get the real picture

Part No :

DF08S

Manufacturer
Sanyo Semiconductor/ON Semiconductor
Description
BRIDGE RECT 1P 800V 1.5A 4SDIP
Catalog
Diodes - Bridge Rectifiers
Availability
19324 pieces
Shipped from
HK warehouse
Expected Shipping Date
Jul 07 - Jul 11 2025
PDF
DF08S PDF
Type Description
Series:-
Package:Tape & Reel (TR)Cut Tape (CT)
Part Status:Active
Diode Type:Single Phase
Technology:Standard
Voltage - Peak Reverse (Max):800 V
Current - Average Rectified (Io):1.5 A
Voltage - Forward (Vf) (Max) @ If:1.1 V @ 1 A
Current - Reverse Leakage @ Vr:10 µA @ 800 V
Operating Temperature:-55°C ~ 150°C (TJ)
Mounting Type:Surface Mount
Package / Case:4-SMD, Gull Wing
Supplier Device Package:4-SDIP
DF08S is available at GangBo-ic.com, Please review product page below for detailed information, including DF08S price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for DF08S to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • DF08S Price
  • DF08S Series
  • DF08S Datasheet
  • DF08S Application
  • DF08S Replacement
  • DF08S Pdf
  • DF08S Applications
  • DF08S Image
  • DF08S Picture
  • DF08S In Stock
  • DF08S Distributor
  • DF08S Features
Top Sellers
Sale GBPC25005W T0G

GBPC25005W T0G

BRIDGE RECT 1P 50V 25A GBPC-W
Sale TS35P05GHD2G

TS35P05GHD2G

BRIDGE RECT 1P 600V 35A TS-6P
Sale TSS4B04GHC2G

TSS4B04GHC2G

BRIDGE RECT 1PHASE 400V 4A TS4B
Top