Email Us
Need Help?
Email now!

Certifications
Recently Viewed
HBG-100P-36A

HBG-100P-36A

LED DRVR CC AC/DC 21.6-36V 2.7A

S-1009C42I-N4T1U

S-1009C42I-N4T1U

IC SUPERVISOR 1 CHANNEL SC82AB

FRDM-KE02Z40M

FRDM-KE02Z40M

FREEDOM KE02 EVAL BRD

CG2250SN

CG2250SN

GDT 250V 20KA 2 POLE

CG2250SN

CG2250SN

Image is for reference, please contact us to get the real picture

Part No :

CG2250SN

Manufacturer
Wickmann / Littelfuse
Description
GDT 250V 20KA 2 POLE
Catalog
Gas Discharge Tube Arresters (GDT)
Availability
760476 pieces
Shipped from
HK warehouse
Expected Shipping Date
Jun 03 - Jun 07 2024
PDF
CG2250SN PDF
Type Description
Series:CG2
Package:Bulk
Part Status:Active
Voltage - DC Spark Over (Nom):250 V
Impulse Discharge Current (8/20µs):20000A (20kA)
Tolerance:-
Number of Poles:2
Fail Short:No
Mounting Type:User Defined
Package / Case:Cylinder No Lead
CG2250SN is available at GangBo-ic.com, Please review product page below for detailed information, including CG2250SN price, datasheets, in-stock availability, technical difficulties. Quickly Enter the access of compare list to find replaceable electronic parts. Want to gain comprehensive data for CG2250SN to optimize the supply chain (include cross references, lifecycle, parametric, counterfeit risk, obsolescence management forecasts), please contact to our Tech-supports team.

GANG BO INDUSTRIAL CO., LIMITED [Hongkong]

UNIT2, 22/F., RICHMOND COMM. BLDG., 109 ARGYLE STREET, MONGKOK, KOWLOON, HK

Office Hours : Mon-Fri, 9:00-18:30(GMT+8)

[email protected]

Phone: 00852-52612101

  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
  • New users will reward $5 as the credits after registration.
  • Every online shopping for $100 will receive a $5 reward.
  • Credits can be used on the second and subsequent orders.
  • The credits are valid for two years from the date your last purchase.
  • CG2250SN Price
  • CG2250SN Series
  • CG2250SN Datasheet
  • CG2250SN Application
  • CG2250SN Replacement
  • CG2250SN Pdf
  • CG2250SN Applications
  • CG2250SN Image
  • CG2250SN Picture
  • CG2250SN In Stock
  • CG2250SN Distributor
  • CG2250SN Features
Top Sellers
Sale BSPS3255TNC

BSPS3255TNC

GDT 230V 3 POLE DIN RAIL
Sale B88069X8830B252

B88069X8830B252

GDT 600V 20KA 3 POLE TH
Sale 2036-42-B

2036-42-B

GDT 420V 10KA 3 POLE TH
Top